NASA STUDY SUMMARY: "STUDY OF AN EVOLUTIONARY INTERIM EARTH ORBIT PROGRAM" 6 April, 1971, NASA TM-X-69243 SUMMARY: This report documents a study of a possible interim Earth orbital manned space flight program that would maintain continuous manned flights between the Skylab I mission and Space Station/Base operation. Although the space shuttle would become operational near the end of these interim missions, its impact upon this program was not evaluated. It considered an evolutionary, gradual, and step-wise spacecraft systems technology development from those as used on the Apollos and Skylab I to that required for the Space Station. The four mission spacecraft were dry workshop versions of the Saturn S-IVB stage, and each would be individually configured, outfitted, and launched by the INT-21 vehicles. These spacecraft were evaluated for crews of three, six, and nine men and for mission lifetimes of one year. Two versions of the Apollo CSM, a three man and a four man crew, were considered as logistics vehicles. The Apollo CSM's would be inserted into orbit by either TITAN III-M, Saturn IB, or SRM/S-IVB launch vehicles. Only the SRM/S-IVB vehicle can insert the crew, Apollo CSM, and necessary logistics payload into orbit in a single launch. A scientific plan was postulated that could be completed during each spacecraft's mission by the size of the crew available. This scientific program over the four missions could accomplish the equivalent of two years of experimental effort on the space station. A technical development plan for the life support and electrical power systems was so defined that first, the components would be flown as experiments, and then, they would be integrated into the later spacecraft as operating systems. The solar cell electrical power system of the first mission evolves into a light weight panel system supplemented by an operating isotope-Brayton system on the later missions. The open life support system of the first mission evolves into a system which recovers both water and oxygen on the last mission. The data handling, communications, radiation shielding, micrometeoroid protection, and orbit keeping systems were determined. The program costs were estimated and, excluding operational costs, the cost for each mission would average about $2 billion of which one-sixth would be for development, one fourth for experiments, and the balance for vehicle acquisition. The program as studied appears to be a viable interim alternative to continue manned Earth orbital flights should some events drastically change current NASA plans for the space shuttle and space station. However, this program is only one of many alternative plans that should be similarly evaluated. It should be recognized that because it is an interim plan, it would use resources in its development that could not be recovered in the development either of the space shuttle or space station. INTRODUCTION: At this writing there are three manned space flight programs currently under study by NASA, ie, the Earth Orbital Skylab I, the Space Station/Space Base, and the Space Shuttle. There are many technology areas and operational capabilities required for the first space station which can only be acquired by flight experience. The Skylab I program will provide extensive flight experience, however, this will be limited and it appears reasonable to examine in detail a possible interim space station program between Skylab I and the Space Station to obtain even more experience and longer flight durations than would be available from Skylab I. The purpose of this report is to give the results of the study of one such interim space station program which capitalizes upon the investment which is being made in the development of the Skylab I. The interim program under study involves the use of four one-year life dry S-IVB stations launched app. 2.5 years apart. An Apollo CSM logistic system using 3 and 4 man versions of the CM was selected for logistical support. Saturn IB, Titan III-M, and SRM/S-IVB stage launch vehicles were selected for the logistic launches. It was recognized that the space shuttle would become available during the latter portion of this studied program, however, it was felt that its use and impact should be a separate consideration of this program if it proved to be viable as defined. This program would leverage the investment made in technical engineering for Skylab I to create four distinct space stations launched at 2.5 year intervals, each with a lifetime of 1 year. This would allow for incorporation of 'lessons learned' into the future vehicles, given that the lead times for systems development allowed for the changes to be incorporated into the next vehicle prior to its launch, or would allow for the longer lead time systems to be incorporated on the next station to be launched after that. The first mission is assumed to start about 2.5 years after Skylab I. Each space station is assumed to be left stored in space in a reactivatable condition at the completion of its mission. With the 2.5 year interval, a major modification, the need for which may become apparent on one space station, could be developed and engineered for the station which would follow on the next launch. The Apollo program as now configured has been assumed to terminate after the completion of the Apollo 15 flight. The first space station would carry a crew of three men continuously for one year. During this time, the crew would grow to six men at the time of logistic resupply and crew change. The second space station would have an average crew of six men, and the third and fourth stations would have crews of nine men. As an option to this program, an evaluation would be made of having a four man logistics craft to support the last two space stations. The sections which follow contain details of the spacecraft used, logistical support intervals and experiment programs. The assumption for the interim program is that the Apollo program terminates after Apollo 15 lunar mission, leaving four Saturn V vehicles not utilized on Apollos 16 thru 19, thus these vehicles may be used as the LV's for the four interim space stations. These stations would be derived from the S-IVB stages configured as livable habitats in operational space vehicles similar to that being used for Skylab I. Each station would be unique, having accomodations for different crew sizes and for particular experiment programs. The station would be launched unmanned and logistically supplied by separate launches of Apollo CSMs. These would rendezvous with the station and keep them supplied continuously for the one-year duration of each mission. For this study, use of the current three-man Apollo CSM was used as the basic supply and Earth return vehicle. A four man version of Apollo has also been considered as an alternative approach in the study, for it has been rather extensively studied, and it could be made available without extensive new vehicle development. It is assumed each crew would orbit for 90 days. Mission A has a minimum crew size of three, but must house six during crew rotation periods. Mission B has an average crew size of six, and Mission C and D have crews of 9. The use of the four man Apollo was only considered on Missions C and D. The use of the four man Apollo reduces the number of logistic spacecraft launches by 1/4, but it increases the crew size by only 1. Three LV's were considered to launch the crew and supplies to the orbiting station. They are each in a different state of technical development and availability. However, when one considers the large number of vehicles that are required, this development difference is of little importance. The basic launch vehicle considered is the Saturn IB. There are some of these LV's, but to complete the program, it would be necessary to reactivate its production. The second launch vehicle is the Titan III-M. This vehicle was essentially operational at the time the Air Force MOL program was cancelled, however, other versions of this vehicle are currently in production and use. In using this vehicle, the integration of the Apollo CSM with this LV would be the primary development requirement. The third logistic vehicle considered is a new one. It would be developed by integrating the 120 inch seven-segment SRMs of the Titan III-M with the Saturn S-IVB stage. The major development item for this LV would be the engineering, development, and operational testing of the integrated SRM first stage with the liquid propellant second stage. LOGISTICS LAUNCH VEHICLES: Only three LV's were considered for the logistic support for the interim space station missions. Each of them has currently developed systems, however, as an LV, only one has had full flight qualification. These three vehicles are the Saturn IB, Titan III-M, and a third, having solid rocket motors clustered for the first stage, and a Saturn S-IVB stage as the second stage. The latter vehicle is called the SRM/S-IVB for convenience. The characteristics and capabilities are considered thusly: Saturn IB- The Saturn IB vehicle was developed to flight qualify the APollo spacecraft and its systems. It consists of a Saturn IB first stage and an S-IVB second stage. In qualifying the Apollo spacecraft, the saturn IB was flight qualified for manned launches. The payload adapter is the same as is used on the Saturn V launches of the Apollo CSM spacecraft. Figure 29 shows the launch payload capability for Saturn IB at various inclinations and altitudes. In can place between 33,000 and 35,000 lbs into 250 n. mi. altitude orbits and at inclinations of greatest interest for space station operations. TITAN III-M- The Titan III-M was designed and configured for logistical support of the Air Force Manned Orbiting Laboratory, or MOL Program. The seven segment SRM for the Titan LV had just about completed their qualification tests when the MOL program was cancelled. The payload launch capability of this vehicle is given in Fig. 30. This vehicle can place about 25,000 lbs into a 250 n.mi. orbit. Titan III-M was configured to be used with the 2 man Gemini spacecraft, and thus it does not have as much payload capability as the Saturn IB. To use the Titan III-M as an LV for the Apollo CSM, it will be necessary to develop and construct an adapter section to mount the Apollo spacecraft atop the Titan booster upper stage. The vehicle would have a slight hammerhead shape at launch. There has been considerable experience with hammerhead configs especially for unmanned systems, and there should be no unexpected undesirable characteristics to prevent qualification of this combination as a man rated LV. SRM/S-IVB VEHICLE- This vehicle has not been assembled, but its components have had extensive flight experience. Three 120 inch seven-segment SRMs, the same as those used on the Titan III-M, comprise the first stage. The S-IVB would be the second stage. Since the LV is a new config, the interconnections of the SRMs of the first stage would need to be designed and tested, as well as the interstage with S-IVB. However, the development of the vehicle should not be extensive for the SRMs had almost completed their test phase under the MOL program. The design of the structural components and the clustering of the SRMs should profit from this previous flight experience. To qualify this vehicle, it should not require many more tests. The calculated performance envelope for this LV is shown in Fig 31. This vehicle can place over 55,000 lbs into a 250 n. mi. orbit at inclinations of interest for space station operations. When considering the LV capabilities, the payload needs require further definement. Not only must the LV insert the CSM into LEO such that rendezvous can be carried out by the CSM, but it must also deliver usuable logistical supplies to the same orbit for delivery by the CSM to the station itself for resupply. Table 22 shows that neither Saturn IB nor Titan III-m have load capabilities sufficient to carry any resupply items. In fact, they cannot insert the Apollo CSM as defined into any of the mission orbits as defined in this study. The Titan III-M lacks over 10,000 lbs capability to perform the logistical mission just for the Apollo CSM, and thus it should not be considered further as a candidate vehicle for use with these missions. Saturn IB lacks between 1500 and 3,000 lbs capability to launch this study CSM. This same Saturn IB willb e used to launch the 3 man Apollo logistical vehicles in support of the Skylab I program. The logistical resupply load over and above the Apollo CSM for this Skylab I program is less than 100 lbs for each launch. By careful staging, the Skylab I logistical missions can be performed by the Saturn IB vehicle. Similarly, careful tailoring of the insertion manuever and greater use of the SPS propulsion system on the CSM could probably increase the capability of the Saturn IB so that it might insert the Apollo CSM into the interim station mission orbits. However, this would result in the necessity to have the resupply items supplied by some other vehicle or means. If unmanned logistics launches are to be considered, the Apollo SM would be necessary for each logistic flight so as to dock the cargo. The weight of the SM, it's expendable, the LV adapter, and nose cone would total about 24,000 lbs. This would leave for each unmanned Saturn IB launch appr. 10,000 lbs for resupply items. This capability, about equal to the average resupply load necessary for each manned logistic mission. Thus, for the full logistic support of these missions by Saturn IB it would require one unmanned logistics vehicle resupply launch with each manned launch on a seperate vehicle. By this means, the Saturn IB could be considered to be a candidate logistic LV for these missions, however, before a final decision is made, a more detailed study would be required of Mission D to investigate how the Isotope Brayton power and astronomy experiments modules could be handled operationally. The third evaluated LV, the SRM/S-IVB, has an excess of resupply capability for each logistic launch. This excess varies from 7,600 to 15,000 lbs depending on the mission. This excess capability, realized in the seven segment rocket motor, however causes one to wonder if the logistic loads could be satisfied with fewer solid motor segments. Although a five segment motor has not been tested for use with manned launches, it has been and is being used extensively for unmanned launches. Thus the capability of a three, five segment SRM first stage with the S-IVB second stage was determined. Its calculated capability turned out to be about 10,000 lbs less than the seven segment SRM 3 motor cluster. As such, it would have capability to support only about half the logistics missions. Because of this, the five segment vehicle could be a candidate LV, but it would not be as attractive. The seven segment SRM/S-IVB has excess capability which can permit either greater resupply loads or experiment hardware growth and this makes it a more desirable choice.