Progress has been slow. However I am close to getting the carbon fiber airframe finished. I have put about 5 thin layers of laminating epoxy on the airframe and the av bay coupler to get it to the point where I can begin sanding it down.
I did take a small, less desirable, section off of the av bay so I could make pistons of them and collars for the fin can and nose cone. It only had 3 coats of epoxy.
It was a case of sanding, starting at 320 grit and going up to 2000 grit. Then applying some Novus 2 then Novus 1.
I have made progress, but it has been slow going. I have the tubes cut for the main bay and the drogue bay. I am in process to find out how long the avionics bay will be, but my working av bay length is about 6.5 inches. Over the long weekend I put a layer of fiberglass on the inside of the main/drogue tubes since there was too much slop with the av bay tube. After the epoxy cured, the main/drogue tubes no longer fit, which is what I expected. So I began the sand/check/repeat process until they fit, which they eventually did. In addition, I had to put a coupler over the fin can coupler to get it to fit on the drogue bay. Finally I glued the bulkheads to the tubes for the pistons that will be used in the main/drogue tubes. At least I am beginning to see the light at the end of the tunnel.
The av bay is the next project. Of all the things that are new and where I had no experience at all, making carbon fiber airframes and designing/building the av bay are it.I have the PerfectFlite MAWD dual-deploy altimeter, the 9V battery housing. I need to come with a SPST switch and an low mA draw LED light connected to show when it is on, but I will start a new thread on that since I will need some help.
Active rockets:
Extreme Darkstar(HPR)
BSD 4" Little John(HPR)
Ultimate Darkstar (HPR)
5.5 polecat NIKE smoke (HPR)
Retired:
Estes Mosquito (Mini Brute)
under construction:
L1 5.5" Standard ARM RIP Erik Gates. Your talents will never be forgotten.
I have been taking a break on rockets since we moved over the New Year holiday. Hopefully in a month or two I will be able to get back to it.
I was making progress on the avionics bay, at least on the design. The altimeter sled, which is basswood, will sit inside a mailing tube (1.50" ID). Theoretically, I could use this configuration on any rocket with that inside diameter or larger.
The av bay sled will have the altimeter, 9v battery, and the on/off switch. The original mailing tube (purchased from Staples) was cut to a length of 6.86" long.
I plan to solder the av bay wires to the switch.
Once I have everything wired up, I will fabricate a make-shift vacuum chamber to test the drogue and main channels to see if they will pass current.
Then the fabrication of the 2 x wood rings and the 2 x end caps. I plan to use AL for the stud bolts and the U-bolts. I ordered them and from McMaster-Carr and I still know where they are post-move. I originally wanted to use 316 stainless steel but AL is about a third of the mass and I wanted to save as much weight as I could. My weight budget for the av bay is 200 g, but I fear I will likely go over it.
This for me is the most complex part of this rocketry. In fact, for me getting a successful dual-deployment will have far more meaning to me than getting L1 or L2 certification. A big plus will be that the av bay is my own design.
I have updated a few drawings that might shed a little more light on the arrangement.
Comment