I work with a group that is fielding two teams this year, and both are in flight testing phase.
They started by building a small kit to get familiar with rocket parts and terms and basic construction. Then they started with rocksim by building a model of the small rocket they built. Then they started designing for the contest which took a couple of weeks, and spent a couple more weeks building 2 copies of their designs. First flight day they flew each rocket at least once. Then we took the results of those flights and went back in and adjusted the mass override and did some Cd backtracking in rocksim based on the flights to tighten up the accuracy of the simulations.
They made some changes to the rockets based on new sims, and are waiting for launch day 2.
Thanks. Sounds like my groups are behind then. They are just now finishing their designs and we are in the process of ordering parts and building the rockets. Did you have each team build only one rocket? and how similar was each teams design. Seems like there are not many possibilities for this years challenge.
One thing to keep in mind is that the suggested schedule that TARC publishes really doesn't give enough time to get in enough test flights and be able to tweek the rocket, if needed.
One of the main goals from the organizer's sake is to just get the kid's to successfully launch a rocket, and the suggested schedule is really based upon that goal.
I'm mentoring a team and they are just about done building their rocket. I think that they are a little behind right now and we've been really lucky with the weather in our area. It's not unusual this time of year to have lots of windy winter weather that can keep them from being able to launch for weeks at a time.
Nonetheless, if this is the team's first year then you can expect that they might be a little behind.
I should mention that this group actually started meeting fairly early with a goal to have a flight ready design before January.
It's tough sometimes when teams don't start until they have done the registration, or wait too long to contact a mentor. I had a team last year who didn't start designing until February, and they just managed to get their qualification flights in before the deadline.