So one of my 4-H kids ordered the BBZ from erockets.biz. It's the first Semroc kit I've seen since Semroc sold, and overall I'm fairly impressed.
Just one thing stood out as an issue: The engine tube is supposed to be a BT-50J, 2.75" long, but the one in the kit is much longer. I forgot to measure it, but it's either a 9" piece or the 7" (or so) main tube for an Alpha.
This is an issue because the kit does not include a thrust ring installation tool (i.e. fake engine casing) to push the ring into place. The instructions are still the original Semroc materials, and so do not explain what to do; for a Skill Level 1 kit, I think that's a mistake. Either the instructions should be changed AND the installation tool included, or the correct tube should have been in the bag.
We passed on that part of the construction; Clayton (the kid of whom I write) assembled the conversion mount, tied the shock cord to the coupler and assembled the main airframe. We'll get together next week to finish it up. Since I had time to do it, I did a simulation and concluded that it should be stable and should fly rather well on an E9-6, so I'm going to swap him parts from my stockpile to build it that way.
If it was his Mom or Dad helping him, and it was a first or second rocket (it's actually his third, but still), they'd have been in for some frustration. This is a bad showing, in my opinion, for erockets.
Just one thing stood out as an issue: The engine tube is supposed to be a BT-50J, 2.75" long, but the one in the kit is much longer. I forgot to measure it, but it's either a 9" piece or the 7" (or so) main tube for an Alpha.
This is an issue because the kit does not include a thrust ring installation tool (i.e. fake engine casing) to push the ring into place. The instructions are still the original Semroc materials, and so do not explain what to do; for a Skill Level 1 kit, I think that's a mistake. Either the instructions should be changed AND the installation tool included, or the correct tube should have been in the bag.
We passed on that part of the construction; Clayton (the kid of whom I write) assembled the conversion mount, tied the shock cord to the coupler and assembled the main airframe. We'll get together next week to finish it up. Since I had time to do it, I did a simulation and concluded that it should be stable and should fly rather well on an E9-6, so I'm going to swap him parts from my stockpile to build it that way.
If it was his Mom or Dad helping him, and it was a first or second rocket (it's actually his third, but still), they'd have been in for some frustration. This is a bad showing, in my opinion, for erockets.


Comment