Now to mount the first (2) rotor blades onto the CRBM.
I first temporarily tape the CRBM onto the Corian slab and then lay the slab across my Herculean thighs. Are you panting yet? I then put a dot of thick CA onto the first and last alignment squares of the CRBM and lay the hinges of the red and the blue rotor blade. While holding the hinges in place I give them a shot of CA accelerator.
Once the accelerator dries and the cat stops throwing up from the room-filling funk of the accelerator, I'll do the "epoxy rivet treatment" to the hinges on the CRBM.
TBC
I first temporarily tape the CRBM onto the Corian slab and then lay the slab across my Herculean thighs. Are you panting yet? I then put a dot of thick CA onto the first and last alignment squares of the CRBM and lay the hinges of the red and the blue rotor blade. While holding the hinges in place I give them a shot of CA accelerator.
Once the accelerator dries and the cat stops throwing up from the room-filling funk of the accelerator, I'll do the "epoxy rivet treatment" to the hinges on the CRBM.
TBC

Comment