Time to show off what I did with the latest cones from Sandman. It's not paint ready yet, but it's all test fit.
Some rings and skirts.

SRB motor mounts. Canted. I may not use them - but I'm hopeful.

SRB aft skirts. I've since bent the hooks more so they sit flat.

SRBs. -There's- some of Gordon's fine work.

And there's the rest. I'm building to be able to separate the SRBs. Rail guide on the SRBs, with a bottom rail made from the packaging from the coffee pods at the day job. Upper connection is a small brass tube that fits in the screw hole for the rail guide. I'll mount a sring on the SRB (not the one pictured) and run monofilament through the ET to tie the SRBs to the ET. To separate, a flight computoer will fire a wire or ignitor to cut the monofilament, and the springs will push the SRBs off the brass tube. Drag will take them from there.


Some rings and skirts.

SRB motor mounts. Canted. I may not use them - but I'm hopeful.

SRB aft skirts. I've since bent the hooks more so they sit flat.

SRBs. -There's- some of Gordon's fine work.

And there's the rest. I'm building to be able to separate the SRBs. Rail guide on the SRBs, with a bottom rail made from the packaging from the coffee pods at the day job. Upper connection is a small brass tube that fits in the screw hole for the rail guide. I'll mount a sring on the SRB (not the one pictured) and run monofilament through the ET to tie the SRBs to the ET. To separate, a flight computoer will fire a wire or ignitor to cut the monofilament, and the springs will push the SRBs off the brass tube. Drag will take them from there.


















Comment