I'm starting to build a Cyclone rocket; see my page here for more information on this rocket. I'll be posting pictures, probably starting tonight.
My revised instructions call for a selection of Semroc parts, but my parts collection consists of items from Semroc and Uncle Mike, including engine mounts by Sunward. I must say, I'm not overly impressed with their 13mm to BT-20 mount; I couldn't get the engine tube to go through the centering rings. Yes, I could sand or peel the inside, but I shouldn't have to do that.
I sorted through my collection of 18mm thrust rings and found that most of them made better BT-5 to BT-20 centering rings than the Sunward rings did. So I swapped them out.
I'll try post pictures of the assembled engine mount tonight. It looks a little funny because of the way it has to go together to accomodate the coupler.
My revised instructions call for a selection of Semroc parts, but my parts collection consists of items from Semroc and Uncle Mike, including engine mounts by Sunward. I must say, I'm not overly impressed with their 13mm to BT-20 mount; I couldn't get the engine tube to go through the centering rings. Yes, I could sand or peel the inside, but I shouldn't have to do that.
I sorted through my collection of 18mm thrust rings and found that most of them made better BT-5 to BT-20 centering rings than the Sunward rings did. So I swapped them out.
I'll try post pictures of the assembled engine mount tonight. It looks a little funny because of the way it has to go together to accomodate the coupler.




Looks good.
Comment