Last night I applied the epoxy fillets, attached the hub half-discs, and brushed some thinned filler on the tail section's spiral grooves and into the dowel-to-fin joints. Tonight I sanded the filler, put fresh fillets on the hub halves, and put a launch lug on each section. On the top section, I attached the lug to the aft end of the ST-10 just above the transition, while on the tail section I installed the lug beside one half-disc. When I glue the top and tail together, I'll have to be careful to align them.
I took the picture below with the two sections slipped together. I won't actually glue them until after I have primed and sanded enough times to get it all smooth; then I'll just have to fix up the joint. I figure it will be easier to work on the tail section without the awkward weight of the top section attached to it.
I took the picture below with the two sections slipped together. I won't actually glue them until after I have primed and sanded enough times to get it all smooth; then I'll just have to fix up the joint. I figure it will be easier to work on the tail section without the awkward weight of the top section attached to it.



Comment