Hi there,
I'm relatively new to model rocketry, flying my Estes Courier rocket quite successfully so far. However, I was very disappointed about the included electric launch system, so I decided to make something a little more "dramatic":
LaunchControl building report
Right now it's three safety switches, with the first switch completely removing all power from the box (thus overriding any potential software bug). Switches 2 and 3 have to be enabled in sequence for the launch button to become active. There's a minimum switch duration of 2 seconds (even if you press the button for a shorter time) as well as an after-launch count-up in case you have a misfire and have to wait 60 seconds to go to the rocket. The unit is self-contained and complete with 12V gel accu.
I'd love to hear your thoughts about this little project, and gather suggestions for improvements. I've heard that for T2 compliance, you ought to short-curcuit the output terminals during the safe condition. Another guy suggested that I put in two relays in series instead of just using a single one. I don't know if a continuity check is something I absolutely have to have (and I don't right now).
What do you think?
I'm relatively new to model rocketry, flying my Estes Courier rocket quite successfully so far. However, I was very disappointed about the included electric launch system, so I decided to make something a little more "dramatic":
LaunchControl building report
Right now it's three safety switches, with the first switch completely removing all power from the box (thus overriding any potential software bug). Switches 2 and 3 have to be enabled in sequence for the launch button to become active. There's a minimum switch duration of 2 seconds (even if you press the button for a shorter time) as well as an after-launch count-up in case you have a misfire and have to wait 60 seconds to go to the rocket. The unit is self-contained and complete with 12V gel accu.
I'd love to hear your thoughts about this little project, and gather suggestions for improvements. I've heard that for T2 compliance, you ought to short-curcuit the output terminals during the safe condition. Another guy suggested that I put in two relays in series instead of just using a single one. I don't know if a continuity check is something I absolutely have to have (and I don't right now).
What do you think?