The PeeWee is a little two stage rocket designed by Tom Rhue and featured as the Estes Design of the Month for October 1961. It stuck me as "primitive" and I do not mean that in a derrogotory manner. As someone said on YORF, it hearkens to a deay when the hobby was being made up as the modeler went along.
I decided to try and build it and promised I would post the build thread on YORF. It seems a fitting place for this venerable design.
I immediately surmised that I would be ordering my parts from Semroc and took a look at the instruction to hit my first roadblock. They call for BT3 tubing. This was one I had not worked with before. The only distributor I found for BT3 was Fliskits (I like their stuff too) but then I realized I was in the MMX dept. I checked the diamter and realized that there was no way I was going to fit an 18mm motor into the Fliskits BT3. So it is that I posted a message on YORF asking for help. The kind folks there soon gave me an answer I could use. The archaic BT3 of Estes was still availible as the Semroc BT30. That being the case, I place my order and had it two days later.
My total parts list was as follows:
1/16" balsa
3.25" Semroc BT30
2.75" Semroc BT30
Balsa Nosecone, Semroc BNC 30C
2x1/8" launch lug
After getting the parts, they sat in the box from 5 Nov until Christmas Day when I finally had time to get started. When I did get started, I found a simple but fun project to occupy an afternoon.
The sustainer body tube was supposed to be 3.125 inches long. I had ordered a 3.25" as the nearest fit. In looking at the directions, there seems to have been some play with this length. If you wanted to build a version that used streamer recovery, a tube as long as 5..5" was recommended. I decided the 1/8" was not going to hurt me. That being the case, the first step was to glue on the nose cone with yellow glue.
I decided to try and build it and promised I would post the build thread on YORF. It seems a fitting place for this venerable design.
I immediately surmised that I would be ordering my parts from Semroc and took a look at the instruction to hit my first roadblock. They call for BT3 tubing. This was one I had not worked with before. The only distributor I found for BT3 was Fliskits (I like their stuff too) but then I realized I was in the MMX dept. I checked the diamter and realized that there was no way I was going to fit an 18mm motor into the Fliskits BT3. So it is that I posted a message on YORF asking for help. The kind folks there soon gave me an answer I could use. The archaic BT3 of Estes was still availible as the Semroc BT30. That being the case, I place my order and had it two days later.
My total parts list was as follows:
1/16" balsa
3.25" Semroc BT30
2.75" Semroc BT30
Balsa Nosecone, Semroc BNC 30C
2x1/8" launch lug
After getting the parts, they sat in the box from 5 Nov until Christmas Day when I finally had time to get started. When I did get started, I found a simple but fun project to occupy an afternoon.
The sustainer body tube was supposed to be 3.125 inches long. I had ordered a 3.25" as the nearest fit. In looking at the directions, there seems to have been some play with this length. If you wanted to build a version that used streamer recovery, a tube as long as 5..5" was recommended. I decided the 1/8" was not going to hurt me. That being the case, the first step was to glue on the nose cone with yellow glue.


Comment