Upscale Nike Ram

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • jdud
    Underachiever
    • Apr 2008
    • 53
    • Galivants Ferry, SC

    #16
    Here is a picture of the parts. The upscale is 175% and based on a Semroc 225 tube. The long tube at the top of the picture is a BT-70H that was cut for the tail section and ebay (the bt-70H conveniently fits inside of a 225 tube).

    Here is a list of parts (best I can remember)

    Main body - Semroc series 225 - 22"
    Payload - Semroc series 225 - 14"
    Nose cone - Semroc ???(had to email Carl about the correct cone - he may have it on the website now)
    Tail section - BT-70H - 3"
    Fins - 1/8" aircraft ply (upscaled from pattern at old rocket plans )
    Motor tube - Semroc 29mm (can't remember how long - about 8-10")
    Centering rings - custom using drill press 2 are 29mm to series 225 and 1 is 29mm to BT-70H
    Small stainless steel u-bolt attached to top centering ring for shock cord attachment
    t-nuts, screws, clips for motor retention
    Ebay - Bt-70H - 7" (I'll add some more detailed pictures of the ebay set up later)

    I'll add some more pictures and descriptions as time allows.
    Attached Files

    Comment

    • jdud
      Underachiever
      • Apr 2008
      • 53
      • Galivants Ferry, SC

      #17
      The first picture is the main tube with the tail section off. The motor mount sticks about 7/8" from the rear of the main tube. This allows for the tail section to be added (see Picture 2).

      The motor mount has one centering ring at the very forward end and another CR at the top of the fins. The third CR is cut to fit inside the tail section (BT-70H) at the rear of the fins. The last ring was added after internal fin fillets were added.

      Also, the fin slots start about 1/4" from the rear of the main tube and the fin slots on the tail section are cut to allow the tail slide in to be even with the motor mount.
      Attached Files

      Comment

      • GregGleason
        U.S. Manned Space Program Buff
        • Mar 2009
        • 1298
        • Houston

        #18
        Originally posted by jdud
        This rocket flies great and the chrome decal on the top makes tracking easy on a sunny day.
        Out of curiosity, how did you do your chrome decal? BTW, great looking rocket!

        Greg

        Comment

        • snaquin
          The_Ripper
          • Jun 2005
          • 1948
          • Louisiana

          #19
          Originally posted by jdud
          Here is a picture of the parts. The upscale is 175% and based on a Semroc 225 tube. The long tube at the top of the picture is a BT-70H that was cut for the tail section and ebay (the bt-70H conveniently fits inside of a 225 tube).

          Here is a list of parts (best I can remember)

          Main body - Semroc series 225 - 22"
          Payload - Semroc series 225 - 14"
          Nose cone - Semroc ???(had to email Carl about the correct cone - he may have it on the website now)
          Tail section - BT-70H - 3"
          Fins - 1/8" aircraft ply (upscaled from pattern at old rocket plans )
          Motor tube - Semroc 29mm (can't remember how long - about 8-10")
          Centering rings - custom using drill press 2 are 29mm to series 225 and 1 is 29mm to BT-70H
          Small stainless steel u-bolt attached to top centering ring for shock cord attachment
          t-nuts, screws, clips for motor retention
          Ebay - Bt-70H - 7" (I'll add some more detailed pictures of the ebay set up later)

          I'll add some more pictures and descriptions as time allows.
          Looks great! I loved working with the BT-70H tubing in the SLS ARCAS kit and I enjoy building with SEMROC "SLS Grade" components for most of my scratch builds same as what is offered in the larger SLS kits. Thanks for posting the parts list as I can see myself building one of these (one day).

          Originally posted by jdud
          The first picture is the main tube with the tail section off. The motor mount sticks about 7/8" from the rear of the main tube. This allows for the tail section to be added (see Picture 2).

          The motor mount has one centering ring at the very forward end and another CR at the top of the fins. The third CR is cut to fit inside the tail section (BT-70H) at the rear of the fins. The last ring was added after internal fin fillets were added.

          Also, the fin slots start about 1/4" from the rear of the main tube and the fin slots on the tail section are cut to allow the tail slide in to be even with the motor mount.
          I like the way you built the rocket using that cap for the tail section to resemble what would have been the exposed portion of the motor mount on the original Nike Ram but also allowing you access to add internal fillets and then capped off with the 29mm ring to finish it out, nice touch. It's a very robust build and I like it a lot.

          Did your dual deploy function as planned?



          .
          Steve Naquin
          TRA# 677 L2
          NAR# 85518
          SAM# 0052

          In Construction: TBD
          In Paint & Detail: TBD
          In Build Queue: TBD
          In Repair: TBD
          2025 Fall Launch Dates: Sept. 27-28 (Rain Date Oct. 4-5), Nov. 1-2 (Rain Date Nov. 8-9)

          Comment

          • jdud
            Underachiever
            • Apr 2008
            • 53
            • Galivants Ferry, SC

            #20
            Originally posted by GregGleason
            Out of curiosity, how did you do your chrome decal? BTW, great looking rocket!
            I picked up some chrome decal sheets from Hobby Lobby. They are 8.5x11 self adhesive sheets. Just trim them to the correct size and wrap them around the tube. I put the seam on the back side lined up with the rail buttons.

            Comment

            • Stargate
              Intermediate Rocketeer
              • May 2011
              • 50

              #21
              Upscale Nike Ram

              Originally posted by jdud
              Here is a picture of the parts. The upscale is 175% and based on a Semroc 225 tube. The long tube at the top of the picture is a BT-70H that was cut for the tail section and ebay (the bt-70H conveniently fits inside of a 225 tube).

              Here is a list of parts (best I can remember)

              Main body - Semroc series 225 - 22"
              Payload - Semroc series 225 - 14"
              Nose cone - Semroc ???(had to email Carl about the correct cone - he may have it on the website now)
              Tail section - BT-70H - 3"
              Fins - 1/8" aircraft ply (upscaled from pattern at old rocket plans )
              Motor tube - Semroc 29mm (can't remember how long - about 8-10")
              Centering rings - custom using drill press 2 are 29mm to series 225 and 1 is 29mm to BT-70H
              Small stainless steel u-bolt attached to top centering ring for shock cord attachment
              t-nuts, screws, clips for motor retention
              Ebay - Bt-70H - 7" (I'll add some more detailed pictures of the ebay set up later)

              I'll add some more pictures and descriptions as time allows.
              jdud,
              I just came across this thread tonight. Thanks to Steve Naquin for telling me about this.
              I did a Pseudo Scale kit version of the Enerjet Nike Ram back in the early 80s under my company, Stargate Rocket Systems. The kit was called the Aero-Ram. Built around Composite Dynamics BT-70H 2.225" OD Tubes and the Composite Dynamics Hollow Foam Nose Cones.
              You did a fantastic job in the build and finishing of your Upscaled Nike Ram. I love it!
              You even scaled up the the 29mm Motor Mount tube to that rear BT-70H tube. Nice touch.

              Did you use a Tube Coupler & Plywood Bulkhead plate with the tube coupler for your payload section?
              and did you ever do a Rocksim file for it? If so, any chance I might be able to get your sim file?
              Thanks again for posting to the forum.

              Larry B
              SAM #234

              Comment

              Working...